8×8 Shed Foundation Calculator & Gravel Takeoff
An 8×8-foot shed requires a 10×10-foot gravel pad (100 sq ft excavation with 1-foot overhang). At 4 inches depth, you need 1.36 cubic yards (1.91 tons) of crushed stone and 5 pressure-treated 4×4 timbers.
Gravel Volume
1.36 yd³
With 10% compaction
Gravel Weight
1.91 tons
Crushed stone base
Pad Footprint
10×10 ft
100 sq ft excavation
4×4 Timbers
5 pieces
8-ft treated timbers
Customize or Adjust This 8×8 ft Project
Pre-filled with standard 8×8 ft measurements. Change depth or waste margins below to update quantities in real time.
Gravel (tons)
3.2 t
Volume (yd³)
2.29 yd³
Pad size
12' × 14'
- 3.2 tons
Crushed stone (#57 or ¾-minus)
≈ 2.29 yd³ (61.6 ft³)
- 7 pieces
4x4 Ground contact timbers (8 ft)
52 linear ft perimeter
- 17 stakes
1/2" × 24" Steel rebar stakes
Anchors timbers into ground every 4 ft
- 193.2 sq ft
Heavy-duty woven geotextile
Subgrade separation fabric (+15% overlap)
Bagged and bulk options are alternatives — the total uses the cheapest one you price.
8×8 ft Material Takeoff Breakdown
| Material | Specification | Quantity Needed |
|---|---|---|
| Crushed Stone | 3/4-minus or #57 stone | 1.91 tons (1.36 yd³) |
| Perimeter Timbers | 4×4 Ground Contact Treated (8 ft) | 5 pieces |
| Rebar Stakes | ½" × 24" steel pins | 10 stakes |
Contractor & Builder Notes for 8×8 ft
- ✓Compact stone in two 2-inch layers rather than trying to tamp all 4 inches at once for maximum density.
Frequently Asked Questions: 8×8 ft
How much gravel for an 8x8 shed?
You need 1.36 cubic yards (1.91 tons) of crushed stone for a 10×10 pad at 4 inches deep.