8×10 Shed Foundation Calculator & Gravel Takeoff
An 8×10-foot shed needs a 10×12-foot gravel pad (120 sq ft excavation with a 12-inch perimeter overhang). At a 4-inch compacted depth, you need 1.63 cubic yards (2.28 tons) of crushed stone and 6 pressure-treated 4×4 perimeter timbers.
Gravel Volume
1.63 yd³
With 10% compaction
Gravel Weight
2.28 tons
3/4-minus stone
Pad Footprint
10×12 ft
120 sq ft excavation
4×4 Timbers
6 pieces
8-ft treated timbers
Customize or Adjust This 8×10 ft Project
Pre-filled with standard 8×10 ft measurements. Change depth or waste margins below to update quantities in real time.
Gravel (tons)
3.2 t
Volume (yd³)
2.29 yd³
Pad size
12' × 14'
- 3.2 tons
Crushed stone (#57 or ¾-minus)
≈ 2.29 yd³ (61.6 ft³)
- 7 pieces
4x4 Ground contact timbers (8 ft)
52 linear ft perimeter
- 17 stakes
1/2" × 24" Steel rebar stakes
Anchors timbers into ground every 4 ft
- 193.2 sq ft
Heavy-duty woven geotextile
Subgrade separation fabric (+15% overlap)
Bagged and bulk options are alternatives — the total uses the cheapest one you price.
8×10 ft Material Takeoff Breakdown
| Material | Specification | Quantity Needed | Notes |
|---|---|---|---|
| Crushed Stone | 3/4-minus crusher run or #57 | 2.28 tons (1.63 yd³) | Includes 10% compaction |
| Perimeter Timbers | 4×4 Ground Contact Treated (8 ft) | 6 pieces | Forms 10×12 timber frame |
| Rebar Stakes | ½" × 24" steel rebar pins | 12 stakes | Driven every 4 feet |
| Geotextile Fabric | 4 oz non-woven fabric | 150 sq ft | Base weed and mud barrier |
Contractor & Builder Notes for 8×10 ft
- ✓Compact the native subsoil with a hand tamper or plate compactor before rolling out the geotextile fabric.
Frequently Asked Questions: 8×10 ft
How many tons of gravel for an 8x10 shed?
You need 2.28 tons (1.63 cubic yards) of crushed stone for a 4-inch deep pad with a 1-foot border.