10×12 ft Material Takeoff

10×12 Shed Foundation Calculator & Gravel Takeoff

A standard 10×12-foot shed requires a 12×14-foot gravel foundation pad (providing a mandatory 12-inch perimeter overhang on all four sides). At a 4-inch compacted depth with a 10% compaction allowance, you need 2.29 cubic yards (3.20 tons) of crushed stone, 7 pressure-treated 4×4 timbers, and 14 rebar anchoring stakes.

Gravel Volume

2.29 yd³

With 10% compaction

Gravel Weight

3.20 tons

Crusher run / #57 stone

Pad Footprint

12×14 ft

168 sq ft excavation

4×4 Timbers

7 pieces

8-ft treated timbers

Customize or Adjust This 10×12 ft Project

Pre-filled with standard 10×12 ft measurements. Change depth or waste margins below to update quantities in real time.

Gravel (tons)

3.2 t

Volume (yd³)

2.29 yd³

Pad size

12' × 14'

  • Crushed stone (#57 or ¾-minus)

    ≈ 2.29 yd³ (61.6 ft³)

    3.2 tons
  • 4x4 Ground contact timbers (8 ft)

    52 linear ft perimeter

    7 pieces
  • 1/2" × 24" Steel rebar stakes

    Anchors timbers into ground every 4 ft

    17 stakes
  • Heavy-duty woven geotextile

    Subgrade separation fabric (+15% overlap)

    193.2 sq ft
Enter your local prices to see an estimated cost.

Bagged and bulk options are alternatives — the total uses the cheapest one you price.

10×12 ft Material Takeoff Breakdown

MaterialSpecificationQuantity NeededNotes
Crushed Stone3/4-minus (crusher run) or #57 clean3.20 tons (2.29 yd³)Compacted in 2-inch lifts
Perimeter Timbers4×4 Ground Contact Treated (8 ft)7 piecesCut to form 12×14 box
Rebar Anchors½" × 24" steel rebar stakes14 stakesPinned through pre-drilled holes
Geotextile Fabric4 oz non-woven landscape underlayment200 sq ftPrevents mud contamination

Contractor & Builder Notes for 10×12 ft

  • ✓Always extend the gravel pad 12 inches beyond shed walls to catch roof dripline runoff and stop muddy splashback against siding.
  • ✓Use crushed stone with fines (crusher run / quarry process) for a rock-solid drive-on pad, or clean #57 angular gravel for maximum drainage.

Frequently Asked Questions: 10×12 ft

How much gravel do I need for a 10x12 shed pad?

With a 12-inch overhang (12×14 ft pad) at 4 inches deep, you need 2.29 cubic yards or 3.20 tons of crushed stone.