12×16 ft Material Takeoff

12×16 Shed Foundation Calculator & Gravel Takeoff

A 12×16-foot workshop or storage shed requires a 14×18-foot gravel pad (252 sq ft). At a 4-inch depth with compaction factor, you need 3.42 cubic yards (4.79 tons) of crushed stone, 8 perimeter timbers, and 16 rebar stakes.

Gravel Volume

3.42 yd³

With 10% compaction

Gravel Weight

4.79 tons

Crushed stone base

Pad Footprint

14×18 ft

252 sq ft excavation

4×4 Timbers

8 pieces

8-ft treated timbers

Customize or Adjust This 12×16 ft Project

Pre-filled with standard 12×16 ft measurements. Change depth or waste margins below to update quantities in real time.

Gravel (tons)

3.2 t

Volume (yd³)

2.29 yd³

Pad size

12' × 14'

  • Crushed stone (#57 or ¾-minus)

    ≈ 2.29 yd³ (61.6 ft³)

    3.2 tons
  • 4x4 Ground contact timbers (8 ft)

    52 linear ft perimeter

    7 pieces
  • 1/2" × 24" Steel rebar stakes

    Anchors timbers into ground every 4 ft

    17 stakes
  • Heavy-duty woven geotextile

    Subgrade separation fabric (+15% overlap)

    193.2 sq ft
Enter your local prices to see an estimated cost.

Bagged and bulk options are alternatives — the total uses the cheapest one you price.

12×16 ft Material Takeoff Breakdown

MaterialSpecificationQuantity Needed
Crushed Stone3/4-minus or #57 stone4.79 tons (3.42 yd³)
Perimeter Timbers4×4 Ground Contact Treated (8 ft)8 pieces
Rebar Stakes½" × 24" steel pins16 stakes

Contractor & Builder Notes for 12×16 ft

  • ✓For sheds storing heavy riding mowers or tractors, step up excavation depth from 4 inches to 6 inches (requires 7.18 tons of stone).

Frequently Asked Questions: 12×16 ft

How many tons of gravel for a 12x16 shed foundation?

Order 4.79 tons (approx. 5 tons) of crushed stone for a standard 4-inch pad with 12 inches of overhang.