10×16 ft Material Takeoff

10×16 Shed Foundation Calculator & Gravel Takeoff

A 10×16-foot shed foundation requires a 12×18-foot gravel pad (216 sq ft excavation with 1-foot border overhang). At a 4-inch depth with 10% compaction allowance, order 2.93 cubic yards (4.11 tons) of crushed stone and 8 pressure-treated 4×4 timbers.

Gravel Volume

2.93 yd³

With 10% compaction

Gravel Weight

4.11 tons

Crushed stone base

Pad Footprint

12×18 ft

216 sq ft excavation

4×4 Timbers

8 pieces

8-ft treated timbers

Customize or Adjust This 10×16 ft Project

Pre-filled with standard 10×16 ft measurements. Change depth or waste margins below to update quantities in real time.

Gravel (tons)

3.2 t

Volume (yd³)

2.29 yd³

Pad size

12' × 14'

  • Crushed stone (#57 or ¾-minus)

    ≈ 2.29 yd³ (61.6 ft³)

    3.2 tons
  • 4x4 Ground contact timbers (8 ft)

    52 linear ft perimeter

    7 pieces
  • 1/2" × 24" Steel rebar stakes

    Anchors timbers into ground every 4 ft

    17 stakes
  • Heavy-duty woven geotextile

    Subgrade separation fabric (+15% overlap)

    193.2 sq ft
Enter your local prices to see an estimated cost.

Bagged and bulk options are alternatives — the total uses the cheapest one you price.

10×16 ft Material Takeoff Breakdown

MaterialSpecificationQuantity Needed
Crushed Stone3/4-minus or #57 stone4.11 tons (2.93 yd³)
Perimeter Timbers4×4 Ground Contact Treated (8 ft)8 pieces
Rebar Stakes½" × 24" steel pins16 stakes

Contractor & Builder Notes for 10×16 ft

  • ✓For a 16-foot span, splice perimeter timbers with overlapping lap joints or galvanized structural mending plates.

Frequently Asked Questions: 10×16 ft

How much gravel do I need for a 10x16 shed?

You need 2.93 cubic yards or 4.11 tons of crushed stone for a 4-inch pad with 12 inches of overhang.